Download Area
Final Summary Report of the study
PDF-Document | 811 KByte
About the Project
Von Wladiwostok bis Lissabon
energiespektrum 5/2008
PDF-Document | 313 KByte
The Feasibility of Synchronous Interconnection between IPS/UPS and UCTE 26. October 2007
PDF-Document
| 701 KByte 
Project Status Summary December 2006
PDF-Document
| 60 KByte 
Connecting East and West Dr. Matthias Luther, Reprint from Power Engineering International, October 2006
PDF-Document
| 154 KByte 
Project Profile June 2005
PDF-Document
| 173 KByte 
Project Description at the Kick-Off Meeting
Dr. Matthias Luther - Project Manager UCTE-IPSUPS Study, April 2005
PDF-Document
| 3.130 KByte 
Kick-off meeting of the Feasibility Study:
“Synchronous Interconnection of the Power Systems of IPS/UPS with UCTE”
EC Keynote speech of Mr. Schmitt von Sydow , April 2005
PDF-Document
| 20 KByte 
Kick-off meeting of the Feasibility Study:
“IPS/UPS Overview"
Sergei Lebed – System Operator – Central Dispatching
Office for UES (Russia), April 2005
PDF-Document
| 20 KByte 
Technical Papers
Comparison of the results of full-scale experiment and long term dynamics
simulation in the Siberian Interconnected Power System
PDF-Document
| 982 KByte 
Dynamic properties of bulk power interconnections
PDF-Document
| 883 KByte 
Simulation of the dynamic system security
as a prerequisite e for the extension of interconnected systems
PDF-Document
| 917 KByte 
Entwicklungen zum gesamteuropäischen
Stromverbund
PDF-Document
| 1.279 KByte 
Stability studies concerning the integration
of CENTREL network into the power system of UCPTE
PDF-Document
| 503 KByte 
Bewertung von Drehstrom-und Gleichstromvarianten
für Hochleistungs-Fernübertragungen im Großverbund
PDF-Document
| 593 KByte 
Parallel operation of CENTREL and UCPTE
networks under system dynamics aspects
PDF-Document
| 663 KByte 
Stabilitätsaspekte bei Ausdehnung
von Verbundnetzen
PDF-Document
| 822 KByte 
Analysis and Damping of Inter-Area Oscillations
in the UCTE/CENTREL Power System
PDF-Document
| Cigré; Session 2000, 38-113 | 809 KByte 
Reliability problems in UPS of Russia regimes management in market and insufficient network transmission capacity conditions
PDF-Document
| Cigré; Session 2002, 39-302 | 371 KByte 
Dynamic System Studies of new Requirements
and Strategies for the Primary Control in the UCPTE/CENTREL Power
System
PDF-Document
| Cigré; Session 1998, 39-106 | 293 KByte 
Reliable electricity system and requested
extensions towards CIS and Baltic countries, North Africa and
Middle East
PDF-Document
| TEN-E Conference 22-23 Sept. 2004 | 3.370 KByte 
Miscellaneous
Forming Electricity Markets in the Commonwealth
of Independent States and its Impact upon Power System Development
PDF-Document
| Cigré; Session 2002, 37-304 | 317 KByte 
|