1. Introduction

Previous chapter

1.2 Scope of Work

The main objectives of the study were to investigate the technical, operational, organisational and legal feasibility for an East-West synchronous interconnection of the transmission systems. It was also charged with identifying the necessary measures and associated costs involved in the implementation of the entire systems. The project work is a combination of analyses and power system simulations for two synchronously coupled systems without enforcing regulations and standards of one system on the other. The initial priority for investigation was and is to maintain the current level of system security and reliability in the systems concerned. This presented a major challenge for the experts from both the IPS/UPS and the UCTE.

Next chapter


 
top