UCTEIPSUPS UCTEIPSUPS Home  |  Contact  |  Masthead   
  Results   Data and System Model   Modelling
 
Introduction
Project Organisation
 
Allocation of Information
First Investigations
Coupling the Systems
Analysis
Allocation of Investments
HVDC System Coupling
Conclusion

UCTEIPSUPS

3. Data Acquisition and System Modelling

Previous chapter

3.2 Modelling

Based on the current separate synchronous areas, models for the power system simulations were prepared by the UCTE and the IPS/UPS, respectively. Both parties were responsible for their respective model preparation and for their individual validation procedures. These were carried out by an interactive comparison of real measurements and system simulations. After the setting up of the individual models, they were merged in order to create joint simulation models for evaluating the impact of a possible synchronous coupling. The UCTE and the IPS/UPS focussed their analyses on their individual synchronous systems in line with their knowledge and skills.

The simulation models were prepared using the best available information that could provide a detailed representation of the system structure in the interface area. In cases where data was not available or not permitted due to (e.g. legal restrictions) equivalent models were subsequently used and validated.

Next chapter


 
top